Air Space Intelligence (ASI) appears in the SMART story for one reason: the Federal Aviation Administration awarded it the contract. Nearly everything the public record says about the company's role arrives through that award, through the agency's own language about the two products involved, and through a handful of statements the company has made since.
This page collects only what is documented, marks clearly what is reported rather than official, and says where the record stops. It is not a company profile: we have no interviews, no financial filings and no access to ASI.
What the FAA hired Air Space Intelligence to build
In June 2026 the FAA announced it had selected Air Space Intelligence for a contract covering two complementary technologies. The first is FMDS, which the agency describes as the new technological backbone of the Air Traffic Control System Command Center. The second is SMART — Strategic Management of Airspace, Routes and Trajectories — described as an enhancement within FMDS rather than a separate system.
That description matters for anyone reading coverage of the program. It means the FAA's public statements about shared data, the roughly 200 data streams and route recommendations are statements about SMART, while the platform those recommendations sit inside is FMDS. The contract section of our SMART guide quotes the agency's wording in full.
Which product does what
The division the FAA draws is narrow and worth keeping straight:
- FMDS is the backbone: the platform layer inside the Command Center.
- SMART is the enhancement inside it: the part that ingests streams, identifies potential conflicts and proposes routes and departure times.
- The award covers both at once, which is why headlines sometimes use "FMDS" and "SMART" as if they were the same thing. The agency's language does not.
No public document we have found breaks the award down by product, so there is no way to say from the record how much of the contract buys FMDS and how much buys SMART.
What the contract says, and what is only reported
Two facts about the award circulate as if they were one. They are not.
The scope is official. The FAA's own release names the two technologies and describes what each is for.
The value is reported. The figure usually quoted — $875 million over 12 years — comes from reporting based on contract records, not from the FAA's announcement, which does not state a value or a term. That distinction is the whole point: the scope can be quoted as the agency's, the price tag cannot.
The 22-center timeline
The deployment record around the award is short and dated:
- 22 June 2026. The FAA announces the award to Air Space Intelligence.
- 21 September 2026. SMART begins in a limited mode in the airspace around Washington, D.C.
- 9–13 October 2026. Lawmakers ask the FAA to pause the system at Reagan National, Dulles and Baltimore/Washington, and separately ask the Government Accountability Office to review the program.
- 10 November 2026. The FAA says it "will now use SMART in the airspace of all 22 centers across the country."
- 13 November 2026. A nationwide ground stop of roughly four hours follows what the FAA describes as communication issues; ASI says the stop was not related to its system.
Nationwide airspace use is not the same as a finished build-out, and the FAA has not published a completion date for full capability. The deployment section lists all 22 centers with the dates the agency gave.
What ASI has said publicly
The company's most specific public statement we have found concerns the 13 November ground stop. ASI said the stop was "not based on or a result of the SMART system, any product of ASI or our integration with FAA and ATC." The Transportation Secretary said at the same time that there was "no possible way" SMART was involved. Nothing in the public record attributes that outage to SMART.
The other statements in the record are not the company's. The National Air Traffic Controllers Association said it was not involved in the "design, testing, or implementation of SMART" — a statement about the union's participation, not an accusation about the vendor.
What the record does not show
Several things a reader might reasonably expect are simply missing, and this page does not fill the gaps:
- No published breakdown of the award by product.
- No published safety case, performance methodology or baseline for the 180 flights, 10 minutes and 80 gallons the FAA reports.
- No confirmation that GAO has accepted the review lawmakers requested.
- No documented account, in the sources this site uses, of the company's size, ownership or other government work.
If any of that changes, the relevant page is updated and the change dated, in line with our corrections policy.
Sources
- FAA: Air Space Intelligence contract announcement · 22 Jun 2026
- FAA: SMART begins limited operations in D.C. airspace · 21 Sep 2026
- FAA: nationwide use and the 180-flight figures · 10 Nov 2026
- Nextgov: 12-year, $875M award · 22 Jun 2026
- Ars Technica: expansion, and NATCA not involved · 11 Nov 2026
- Letter requesting a GAO review (PDF) · 13 Oct 2026
- The Hill: ASI denies link to the ground stop · 13 Nov 2026